PREVENTIVE MAINTENANCE DESIGN CONSIDERATIONS BASIC INFORMATION


The best preventive maintenance programs start during the design of the facility. A key design consideration in order to support preventive maintenance is to accommodate planned power outages so that maintenance activities can proceed.

For example, if delivery of power is not a 24 hour necessity, then extended outages after normal work hours can be allowed for maintenance activities. Otherwise, consider design features that can speed up the maintenance process or reduce the duration of the outage to loads.

These might include redundant circuits, alternate power sources, or protective devices such as drawout circuit breakers (rather than fixed-mount circuit breakers).

Additional consideration should be given to the accessibility of the electrical equipment for maintenance. Circuit breaker location can be critical to the maintenance process.

An example would be circuit breakers that are installed in a basement that has only stairway access through which equipment can be brought down to the circuit breaker location. In addition, access to the back of switchboards or switchgear, as opposed to their being mounted against the wall, may be necessary in order to perform thorough maintenance.

The environment in which the equipment is installed can play an important part in maintenance. Where equipment is mounted (inside or outside) and whether it is properly enclosed and protected from dust, moisture, and chemical contamination are all factors that influence the frequency with which maintenance tasks should be performed.

The design phase is also the period in which the establishment of baseline data for the equipment should be considered. This can be done by including in the design specifications the acceptance or start-up testing of the equipment when it is Þrst installed. The InterNational Electrical Testing Association (NETA) provides detailed specifications for electrical power equipment in NETA ATS-1995 [B1].

Design drawings are very important to an effective maintenance program. As-built drawings should be kept up-to-date. An accurate single-line diagram is crucial to the effective and safe operation of the equipment.

This helps the operator to understand the consequences of switching a circuit that can interrupt power in an undesirable or unplanned mode. More significantly, it can help avoid the accidental energization of equipment.

As part of the procurement of the electrical equipment, consideration should be given to the tools and instruments that are required to perform effective maintenance, such as hoists or manual-lift trucks that are used to remove and install circuit breakers. These tools and instruments will help to ensure safety and productivity. Finally, the installation, operation, and maintenance manuals should be obtained and filed.